Dongo Kundu Bypass on Course

Dongo Kundu bypass progress
KeNHA recently inspected ongoing road works constituting the Mombasa Port Area Development Project (Dongo Kundu bypass). Image by KeNHA

The KeNHA Board of Directors and Senior Management recently inspected the ongoing Package 2 and 3 of the Mombasa Port Area Road Development Project (Dongo Kundu Bypass).

Package 2, which runs from Mwache interchange and ends at Dongo Kundu (Mwangala), is at 29 percent physical progress. Package 3, which starts at Mwangala to Kibundani, is at 76 percent physical progress.

The two roads connect with the Dongo Kundu Bypass Package 1 at Mwache Interchange and terminate at Kibundani along the Mombasa – Lunga Lunga road. The road will play a significant role in easing traffic congestion in Mombasa town and boost economic growth in the South Coast. –KeNHA